View Details

Return to the Bids Homepage

Bid Classification: 
Construction
Bid Type:  Request for Proposals
Bid Number:  0999006905
Bid Name:  Fraser Valley Regional District - Cultus Lake WWTP - RFP
Bid Status:  Closed
Published Date:  Fri Dec 2, 2022 11:55:00 AM (PST)
Bid Closing Date:  Tue Jan 10, 2023 2:00:00 PM (PST)
Question Deadline:  Tue Dec 20, 2022 2:00:00 PM (PST)
Electronic Auctions:  Not Applicable
Language for Bid Submissions:  English unless specified in the bid document
Submission Type:  Online Submissions Only
Submission Address:  Online Submissions Only
Public Opening:  No
Description: 

The Fraser Valley Regional District (FVRD) is looking to construct a new Class A MWR Class A with phosphorous removal) WWTP which will improve the treatment and management for wastewater. The new WWTP will improve services to existing residents and better protect public and environmental health.

The construction of the plant includes the following equipment:

•               Headworks – Mechanical Screen with Spiral Auger and Vortex Grit Removal System

•               Secondary Treatment – Sequencing Batch Reactors (SBR)

•               Effluent Filtration – Drum Filters c/w Loading Crane

•               Effluent Disinfection – UV Disinfection

•               Sludge Digestion – Aerobic Digesters (Fine Bubble Diffusers c/w Mechanical Mixer)

•               Sludge Dewatering – Centrifuge c/w Shaftless Screw Conveyor Polymer Feed

•               Chemical Feeds – Alkalinity Tank Dosing, Coagulant Dosing Skid

•               Odour Control – Activated Carbon Absorption System 

•               Reclaimed water re-use system

The process equipment is to be housed in two precast concrete buildings. The main building will house the headworks, blowers, odour control, sludge dewatering and chemical dosing equipment. The filter building will contain tertiary filtration, coagulant dosing, reclaimed water re-use system and will be built over the equalization tank. Secondary treatment will occur in two poured in place SBR tanks. Sludge digestion will occur in two poured in place aerobic digesters. The treated effluent will be disposed of via two rapid infiltration basins (RIB). Note that the RIBs are already built, and only need to have piping added and be connected to the treatment plant. Included in the scope is building supply and install, concrete works, process piping, yard piping, electrical, mechanical, miscellaneous instrumentation, SCADA, landscaping, and other ancillary works.

Bid Document Access:  Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $439.90, per bid fee - $132.04).
Categories:  Show Categories [+]
  • Construction
    • Infrastructure (Wastewater)
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.

Bids Submitted

The following are the unofficial bid results

No submitted bids...

Plan Takers

The following are the plan takers for the bid:

There are no plan takers for this bid.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.